1, the equipment should be installed on the level of concrete foundation, with anchor bolts fixed.
2, the installation should pay attention to the host body and horizontal vertical.
3, after the installation of the inspection of all parts of the bolts loose and the main door is fastened, such as please for fastening.
4, according to the power of the device configuration power cord and control switch.
5, inspection completed, the empty load test, commissioning normal can be produced.